精品好资料如有侵权请联系网站删除楫品好资料5_9.4_0.12)/(16_6.6)=0.222m弧形折算厚度=0.222_0.2=0.044m总厚度h=0.222+0.044=0.266m2.1.2钢梁的荷载钢筋碎自重25kN/m325_1.4_0.266_1.2=11.17kN/m脚手架、模板自重0.75kN/m,0.75_1.4_3(三层)_1.2=3.78kN/m施工振捣荷载ZkN/m?2_1.4_1.4=3.92kN/m施工活载lkN/m?1_1.4_1.4=1.96kN/mq=q静+q活=14.95+5.88=于3kN/m2.2钢梁验算2.2.1.钢梁计算简图nn、.二idqs+saa=aaLN/mrRbRcILi=14Q0L2=2400IL3=28OO2.2.2钢梁弯矩计算及弯矩图Ma二于3_1.472=0.081qs0.081_14.9513.97kNmMab产qL22/8(于1+13.97)/2=如有侵权请联系网站删除精品好资料如有侵权请联系网站删除P1=q(L+L)/2=于3_2.6=54.16kNP2=qL:/2+qL3=(于3_1.2)+(于3_1.4)=54.16k_TkP/sinak54.16/0.789=68.64kNT2=P2/sina2=54.16/0.811=66.78kN2.3.2钢丝绳抗拉强度计算采用6_37,226mm钢丝绳,查表,破断拉力F,=388.5kN,a=0.82,;810(按捆绑吊索安全系数取用,勿需进行抗剪验算)。
(1)前道钢丝绳:FJ=2(aF8/K)=2_0.82_388.5/9=70.8;T2=66.78kN(满足要求)
(2)后道钢丝绳:F=2(aF8/K)=2_0.82_388.5/9=70.8;T1=68.64kN(满足要求)2.4吊环设计在钢梁吊环位置焊于310_10钢板(四周围焊),钢板上部割中45圆孔,利用圆孔作吊环。为防止钢板楞角切割钢丝绳,在圆孔处钢板两面各焊2.4.1钢板割孔(A=L=68.64kNA产(于45)_8=1240mm2o=N/Am=68640/1240=55.4N/mm2;f=215N/mm2(满足要求)2.4.2钢板割孔(BB截面最上边沿的正应力计算:CfFs/A=XXX.614/75_1056.2N/mm2BB截面的强度验算:旧+3丁=2'+3_72.2r=137.1;(j=140N/mm2(满足要求)2.4.3钢丝绳孔壁局部承压验算5d=T,/dE5=68640/26_(10+12+12)=77.65N/mm2;;jcd(满足要求)L吊点处钢丝绳的最大拉力d钢丝绳的直径工一孔壁钢板厚度的总和acd;0.9f=0.9_215N/mm:=193.5N/mm22.5支撑架的搭设及要求根据施工现场及本工程的具体特点。木工程弧形顶盖梁板的结构支撑架采取在
16、。槽钢上搭设钢管整体支模架的方式进行施工。
(1)支模架的搭设尺寸主梁立杆横距800mm,纵距600mm,步距h=1500mm次梁立杆横距1400mm,纵距1000mm,步距h=1500mm板底立杆横距1400mm,纵距1000mm,步距h=1500mm
(2)脚手架搭设顺序安装1灰槽钢、水平支撑钢管一立柱位置铺通长木防一放置纵向扫地杆一立柱一横向扫地杆一第一步纵向水平杆一第一步横向水平杆一第二步纵向水平杆一第二步横向水平杆O
(3)材料的选择及要求:架料采用48_3.5钢管,其力学性能符合现行国标碳素结构钢GB70085规定,各活动部位灵活,无裂纹、气孔、毛刺等。
(4)立杆必须安放在木枕上,扫地杆必须与槽钢连接成整体,立杆接长上部架采用搭接,搭接长度不小于1m,不少于两个扣件固定。中下部架均采用对接扣件连接,对接要求按JGJ130如有侵权请联系网站删除楫品好资料如有侵权请联系网站删除